Matching procedures and technical information

 


MAXIMUM AND MINIMUM TECHNICALLY FEASIBLE PARAMETERS

Minimum and maximum technically feasible pressure of gas transmission pipelines:

Gas pipelines Minimum operating pressure, bar Maximum operating pressure, bar
Izborsk – Inčukalns UGS 25 47
Valdai – Pskov – Riga 25 47
Riga – Inčukalns UGS line I 25 40
Riga – Inčukalns UGS line II 25 40
Riga – Panevežys 25 40
Vireši – Tallinn 25 45

 

Technically feasible pressure for natural gas injection and withdrawal from storage:

Year Season Minimum operating pressure, bar Maximum operating pressure, bar
2018/2019 Withdrawal 27 40
2018 Injection 27 37

 

MATCHING PROCEDURES

        Metering location

Booking procedure

(re)Nomination procedure

Allocation procedure

  GMS Kemenai

yes

yes

  last confirmed (re)nomination

  GMS Korneti (Izborska)

yes

yes*

  allocated as measured

TSO measured quantity

  GMS Karksi

yes

yes

  last confirmed (re)nomination

  the transmission system            interconnection with the storage facility

-

yes

  last confirmed (re)nomination

  user’s system directly connection with the transmission system

-

-

-

  exit point for gas supplies to the Latvian market

no

no

DSO measured quantity

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

* Russian TSO nomination matching (in cubic meters)